Annual Fire Safety Report

The Fire Safety Report provides information regarding fire safety in student residential facilities that Roosevelt University has lease agreements with. The Fire Log provides information on fires that occurred in these facilities to include: the number of fires and the cause of each fire, number of injuries related to a fire that result in treatment at a residential facility, number of deaths related to a fire and value of property damage caused by a fire.

Description of Student Residential Facilities Fire Safety Systems

Location Sprinkler System Smoke/ Heat Detection Pull Stations Fire Extinguishing Devices Mounted Evacuation
Maps
# of Evacuation Drills per year
University Center
525 South State
X X X X X 2
Fornelli Hall
55 E. Washington
X X X X X 1
**2 East 8th X X 0 X X 2

Fire Log 1/2011 to 12/2011

Location Fire Incident Date Reported Time General Location Value of Property Damage Injuries Deaths Nature
University Center
525 S. State
0 N/A N/A N/A N/A N/A N/A NA
Fornelli Hall (ROW)
55 E. Washington
1 2/1/2011 7:50pm 14th floor $0.00 0 0 Cooking Mishap
(unintentional)
**2 East 8th 0 N/A N/A N/A N/A N/A N/A NA

Fire Log 1/2010 to 12/2010

Location Fire Incident Date Reported Time General Location Value of Property Damage Injuries Deaths Nature
University Center
525 S. State
2 02/27/10 7:00am 17th Floor $35.00 0 0 Criminal Damage - Poster
05/07/10  10:00pm  6th Floor  $0.00   0  0 Cooking Mishap 
Fornelli Hall
55 E. Washington
0 N/A N/A N/A N/A N/A N/A NA
**2 East 8th 0 N/A N/A N/A N/A N/A N/A NA

Fire Log 1/2009 to 12/2009

Location Fire Incident Date Reported Time General Location Value of Property Damage Injuries Deaths Nature
University Center
525 S. State
1 9/24/09 5:00 p.m. 9th FLOOR Suite Side $150.00 0 0 Electrical fire from a microwave/ fridge
Fornelli Hall
55 E. Washington
0 N/A N/A N/A N/A N/A N/A NA
*Dwight Lofts
642 S Clark
0 N/A N/A N/A N/A N/A N/A NA
**2 East 8th 0 N/A N/A N/A N/A N/A N/A NA

*RU leasing agreement with this facility ended in December 2009.

**RU Leasing agreement with this facility began in August 2010